Q

UESTION

Some critics have claimed that by outsourcing so much work, Boeing has been exporting American jobs overseas. Is this criticism fair? How should the company respond to such criticisms?

Building the Boeing 787

INSTRUCTIONS FOR ASSIGNMENT
Your responses should be well-rounded and analytical and should not just provide a conclusion or an opinion without explaining the reason for the choice. For full credit, you need to use the material from the week’s lectures, text, and/or discussions when responding to the questions. It is important that you incorporate the question into your response (i.e., summarize the case in the Summary) and explain the principle(s) or concept(s) from the text that underlies your judgment. For each case, you should provide at least two references in APA format (in-text citations and references as described in detail in the Syllabus). Each answer should be double-spaced in 12 point.
PLEASE include and Use the following headings and lengths in your paper:
Summary
In this section, you should summarize the case in one paragraph.
Questions
Number each question. Each specific question under the numbered Case Discussion Questions should be a paragraph in length because many Case Discussion Questions contain more than one question.
Be sure to restate each question at the beginning of each answer before answering it. Apply the concepts from the appropriate chapters in your answers.
References:
Include citations throughout the paper and a reference page with your sources. Use APA style citations and references.

Closing case: Building the Boeing 787
Boeing’s newest commercial jet aircraft, the wide-bodied 787 jet, is a bold bet on the future of both airline travel and plane making. Designed to fly long-haul point-to-point routes, the 250-seat 787 is made largely out of composite materials, such as carbon fibers, rather than traditional materials such as aluminum. Some 80 percent of the 787 by volume is composite materials, making the plane 20 percent lighter than a traditional aircraft of the same size, which translates into a big saving in jet fuel consumption and costs. The 787 is also packed full of other design innovations, including larger windows, greater headroom, and state-of-the-art electronics on the flight deck and in the passenger compartment.
To reduce the risks associated with this technological gamble, Boeing outsourced an unprecedented 70 percent of the content of the 787 to other manufacturers, most of them based in other nations. In contrast, 50 percent of the Boeing 777 was outsourced, 30 percent of the 767, and only 5 percent of the 707. The idea was that in return for a share of the work, partners would contribute toward the estimated $8 billion in development costs for the 787. In addition, by outsourcing, Boeing believed it could tap into the expertise of the most efficient producers, wherever they might be located, thereby driving down the costs of making the plane. Furthermore, Boeing believed that outsourcing some work to foreign countries would help it garner sales in those countries. Boeing’s role in the entire process was to design the plane, market and sell it, and undertake final assembly in its Everett plant in Washington State. Boeing also believed that by outsourcing the design of so many components, it could cut the time to develop this aircraft to four years from the six that is normal in the industry.
Some 17 partners in 10 countries were selected to produce major parts of the aircraft. The rear fuselage was to be made by Vought Aircraft Industries in South Carolina, Alenia Aeronautical of Italy was to make the middle fuselage sections and horizontal tailpieces. Three Japanese companies, Fuji, Kawasaki, and Mitsubishi, were to produce the planes wing. The nose section was to be made by Toronto-based Onex Corporation. All of these bulky pieces were to be shipped to Everett for final assembly aboard a fleet of three modified Boeing 747 freighters call “Dreamlifters.”
Until late 2007, the strategy seemed to be working remarkably well. Boeing had booked orders for more than 770 aircraft, worth more than $100 billion, making the 787 the most successful aircraft launch in the history of commercial aviation. But behind the scenes, cracks were appearing in Boeing’s globally dispersed supply chain. In mid-2007, Boeing admitted the 787 might be a few months late due to problems with the supply of special fasteners for the fuselage. As it turned out, the problems were much more serious. By early 2008 Boeing was admitting to a delay of up to 12 months in the delivery of the first 787, an additional $2 billion in development costs, and was facing the possibility of having to pay millions in penalty clause payments for late delivery to its leading customers.
The core issue was that several key partners had not been able to meets Boeing’s delivery schedules. To make composite parts, for example, Italy’s Alenia had to build a new factory, but the site that it chose was a 300-year-old olive grove, and it faced months of haggling with local authorities and had to agree to replant the trees elsewhere before it could break ground. To compound problems, its first fuselage sections delivered to Boeing did not meet the required quality standards. Then when parts did arrive at Everett, Boeing found that many components had not been installed in the fuselages (as required), and that assembly instructions were available only in Italian. Other problems arose because several partners themselves outsourced mission critical design work to other enterprises. Vought, for example, outsourced the design and building of floor pieces for which it was responsible to an Israeli company. In turn, the Israeli company had trouble meeting Boeing’s exacting quality standards. However, because it was reporting to Vought, not Boeing, executives at Boeing did not learn of this until it had already become a serious bottleneck. Upon learning of the issue, Boeing rapidly dispatched engineers to Israel to work with the company, but by now several months had been lost. Boeing also subsequently acquired Vought in 2009, bringing the supplier in-house.
Despite all of these issues, Boeing remains committed to its outsourcing program.
However, the company has learned that if it is going to outsource work to foreign suppliers, much closer management oversight and coordination is required. The company has also indicated that as valuable as outsourcing can be, it probably went too far with the 787. Going forward, Boeing has signaled that it will not outsource key components that are seen as a source of Boeing’s competitive advantage (wings, in particular, are often mentioned as a component that may not be outsourced for future aircraft models).
Case Discussion Questions
1. What are the benefits to Boeing of outsourcing so much work on the 787 to foreign suppliers? What are the potential risks? Do the benefits outweigh the risks?
2. In 2007 and 2008 Boeing ran into several publicized issues with regard to its management of a globally dispersed supply chain? What are the causes of these problems? What can a company such as Boeing do to make sure such problems do not occur in the future?
3. Some critics have claimed that by outsourcing so much work, Boeing has been exporting American jobs overseas. Is this criticism fair? How should the company respond to such criticisms? (Hill 490)

 


A

NSWER


   No. Of Words: 755
   Pages 3.02
   Type: Essay
   Price: $8.00

Building Boeing 787

Student’s Name

University affiliations

Introduction

Summary

Boeing xxxxxx introduced a new-commercial airline built with amalgamated raw materials xxxxxx as carbon fiber raxxxxxxr xxxxxx Aluminum. The jets xxxxxx designed to fly xxxxxx haul routes xxxxxx xxxxxx made lighter save on fuel consumption xxxxxx xxxxxx of operation. The Boeing 787 is fitted with xxxxxxr windows, xxxxxxer headroom xxxxxx state of xxxxxx art electronics. Boeing xxxxxx outsourced xxxxxx of xxxxxx 787 xxxxxx xxxxxx manuxxxxxxurers xxxxxx in xxxxxx nations. Txxxxxx is because Boeing believed it xxxxxx xxxxxx xxxxxx xxxxxx expertise of efficient producer, hence, help in reducing xxxxxx xxxxxx of making xxxxxx plane. In xxxxxx, Boeing held xxxxxx view xxxxxx outsourcing xxxxxx help xxxxxx push xxxxxx sales in xxxxxx xxxxxxies. Furxxxxxxrxxxxxx, outsourcing xxxxxx help xxxxxx to cut xxxxxx xxxxxxe spent on masking xxxxxx plane. Vought Aircraft made xxxxxx rear fuselage xxxxxx Alenia Aeronautic made middle fuselage xxxxxx Horizontal tailpieces. Three Japanese companies made xxxxxx plane’s wings xxxxxx Onex Corporation made xxxxxx nose section. xxxxxx, Boeing 787 experienced xxxxxxdelays because xxxxxxmanuxxxxxxurers